Bridge constructions
During the construction of river and still water bridges, we float the pre-assembled bridges and bridge elements to the site, then use a floating crane to lift them in place. We support the bridge construction work by building and operating barge bridges and providing a water rescue service, with 24-hour surveillance of our project equipment. We build and operate barge bridges to service the on-water construction (sheet piling, concreting) and installation works with water units. We provide a water rescue service for construction works, setting up transport and mooring units made up of pontoons.
Featured References
Press monitoring
Decisive Moments in Mohács: Creating a Dry Work Area in the Middle of a Rushing River
According to magyarepitok.hu, the construction of the Mohács Danube Bridge has reached a key phase: on October 1, the first shell element of Pier No. 3 was placed into the riverbed. During the works carried out by Duna Aszfalt Zrt., six reinforced concrete shell elements will be stacked to create a dry work area in […]
Read moreThe missing monument elements of the Chain Bridge are being lifted into place from a barge
Illustrated report on the restoration work carried out at Lánchíd.
Read moreThe giant floating crane plays a key role in the new milestone of the Paks Danube Bridge – video
The work process of raising the formwork trolley was captured on video at the Danube Bridge in Paks.