Diving operations
Our industrial divers work mainly on bridge construction and reconstruction works on bridge piers, as well as on the construction and maintenance of streamline inlets, river regulation structures and harbours. They carry out cleaning and repair of headworks, exploration of the river bed, search for foreign objects, and soil mechanical and river bed drillings.
Featured References
Renovation of the piles of the Southern Railway Bridge 2011-2013
During the reinforcement of the river piers of the Southern Railway Danube Bridge and the addition of reinforced concrete panels to the piers, the construction schedule was repeatedly overruled by high water levels.
Read moreBaja-Bátaszék Railway Bridge pier reinforcement 2014
The Türr István Bridge in Baja is the southernmost road and railway bridge over the Danube in Hungary. Its pier was reinforced with large-panel steel formwork. Due to the strong current, the site was particularly dangerous for our industrial divers.
Read moreMargaret Bridge, debris clearance, munitions clearance 2009
During the reconstruction of the Margaret Bridge, which started in 2009, our main task was to retrieve the pieces of the bridge destroyed during World War II and the transport barges that had sunk there.
Read morePress monitoring
The missing monument elements of the Chain Bridge are being lifted into place from a barge
Illustrated report on the restoration work carried out at Lánchíd.
Read moreThe giant floating crane plays a key role in the new milestone of the Paks Danube Bridge – video
The work process of raising the formwork trolley was captured on video at the Danube Bridge in Paks.
Read moreWhat kind of monster anchors on the Danube at the Rákóczi bridge? We watched it!
Interview with our managing director, Zoltán Kállai.
Read more