hspdoo
Our activity
In International Waters
In International Waters
HSP Hidepito Specijal doo To strengthen our international presence, in March 2023 we established our Serbian subsidiary, HSP Hidepito Specijal doo, headquartered in Novi Sad. The purpose of founding the company is to effectively apply the professional knowledge and experience we have accumulated over more than 35 years to bridge construction projects in Serbia. The […]
Featured References
Old Sava Bridge – Removal of Superstructure Elements, Belgrade
The dismantling of the Old Sava Bridge in Belgrade began with the phased removal of the bridge superstructure elements, preceding the later lifting of the arch span. During the works, three large-scale bridge sections had to be removed by floating crane operations carried out in multiple stages. The first phase involved the removal of the […]
Read more
Old Sava Bridge Arch Span Pulled Ashore, Belgrade
A key phase in the dismantling of the Old Sava Bridge in Belgrade was the pulling of the steel arch span onto the riverbank, closely following the previously completed lifting and float-out operations. The bridge element, removed during the summer of 2025, remained supported on TS52 lifting barges for several months. During this period, the […]
Read more
Removal of the Arch Span of the Old Sava Bridge, Belgrade
Removal of the Arch Span of the Old Sava Bridge, Belgrade Podizanje lučne konstrukcije Starog savskog mosta, Beograd The dismantling of the Old Sava Bridge in Belgrade is perhaps our most complex international project to date, with one of its most critical stages being the removal of the steel arch structure. The work had begun […]
Read morePress monitoring
Decisive Moments in Mohács: Creating a Dry Work Area in the Middle of a Rushing River
According to magyarepitok.hu, the construction of the Mohács Danube Bridge has reached a key phase: on October 1, the first shell element of Pier No. 3 was placed into the riverbed. During the works carried out by Duna Aszfalt Zrt., six reinforced concrete shell elements will be stacked to create a dry work area in […]
Read moreThe missing monument elements of the Chain Bridge are being lifted into place from a barge
Illustrated report on the restoration work carried out at Lánchíd.
Read moreThe giant floating crane plays a key role in the new milestone of the Paks Danube Bridge – video
The work process of raising the formwork trolley was captured on video at the Danube Bridge in Paks.
Read more