In International Waters
HSP Hidepito Specijal doo
To strengthen our international presence, in March 2023 we established our Serbian subsidiary, HSP Hidepito Specijal doo, headquartered in Novi Sad. The purpose of founding the company is to effectively apply the professional knowledge and experience we have accumulated over more than 35 years to bridge construction projects in Serbia.
The new company creates an opportunity for HSP’s specialized equipment fleet — including floating cranes and lifting towers — to participate directly in bridge demolition and construction works in the region. In addition, the use of modern underwater survey technologies, such as the multibeam system, as well as specialized diving activities, contributes to more accurate project preparation and smoother implementation.
By establishing HSP Hidepito Specijal doo, our goal is to take an active role in the region’s infrastructure developments and provide our partners with high-quality, complex engineering solutions.
U međunarodnim vodama
Kako bismo ojačali naše međunarodno prisustvo, osnovali smo našu srpsku poslovnicu, HSP Hidepito Specijal doo, sa sedištem u Novom Sadu, u martu 2023. godine. Cilj osnivanja kompanije je efikasno korišćenje našeg stručnog znanja i iskustva akumuliranog tokom više od 35 godina u projektima izgradnje mostova.
Nova kompanija stvara mogućnost da HSP-ova flota specijalizovane opreme – uključujući plutajuće dizalice i tornjeve za podizanje – direktno učestvuje u radovima na rušenju i izgradnji mostova u regionu. Pored toga, upotreba savremenih tehnologija podvodnog mapiranja, kao što je multibeam sistem, i specijalne ronilačke aktivnosti doprinose preciznijoj pripremi i nesmetanoj realizaciji projekata.
Osnivanjem HSP Hidepito Specijal doo, naš cilj je da preuzmemo aktivnu ulogu u razvoju infrastrukture regiona i ponudimo visokokvalitetna, kompleksna inženjerska rešenja našim partnerima.
Featured References
Old Sava Bridge – Removal of Superstructure Elements, Belgrade
The dismantling of the Old Sava Bridge in Belgrade began with the phased removal of the bridge superstructure elements, preceding the later lifting of the arch span. During the works, three large-scale bridge sections had to be removed by floating crane operations carried out in multiple stages. The first phase involved the removal of the […]
Read more
Old Sava Bridge Arch Span Pulled Ashore, Belgrade
A key phase in the dismantling of the Old Sava Bridge in Belgrade was the pulling of the steel arch span onto the riverbank, closely following the previously completed lifting and float-out operations. The bridge element, removed during the summer of 2025, remained supported on TS52 lifting barges for several months. During this period, the […]
Read more
Removal of the Arch Span of the Old Sava Bridge, Belgrade
Removal of the Arch Span of the Old Sava Bridge, Belgrade Podizanje lučne konstrukcije Starog savskog mosta, Beograd The dismantling of the Old Sava Bridge in Belgrade is perhaps our most complex international project to date, with one of its most critical stages being the removal of the steel arch structure. The work had begun […]
Read morePress monitoring
Decisive Moments in Mohács: Creating a Dry Work Area in the Middle of a Rushing River
According to magyarepitok.hu, the construction of the Mohács Danube Bridge has reached a key phase: on October 1, the first shell element of Pier No. 3 was placed into the riverbed. During the works carried out by Duna Aszfalt Zrt., six reinforced concrete shell elements will be stacked to create a dry work area in […]
Read moreThe missing monument elements of the Chain Bridge are being lifted into place from a barge
Illustrated report on the restoration work carried out at Lánchíd.
Read moreThe giant floating crane plays a key role in the new milestone of the Paks Danube Bridge – video
The work process of raising the formwork trolley was captured on video at the Danube Bridge in Paks.
Read more