Construction and renovation of structures
We have extensive experience in flood control and floodplain revitalisation developments and the construction of flood control reservoirs. We also undertake the development and reconstruction of inlet and outlet structures, sluices, and the design and construction of fish ladders.
Featured References
Press monitoring
It Is Not True That the Weir Collapsed, but the Deepening of the Riverbed Does Need to Be Halted – An Exclusive Report from Paks
Válasz Online reports from the site on the background and experience of the weir constructed to ensure the safe cooling of the Paks Nuclear Power Plant. The article presents the technical solutions behind the project, the issue of riverbed erosion, and the views of water management experts. You can read the full article HERE.
Read moreThe Paks Weir Issue
The key water-level-raising section of the Paks weir has been completed, ensuring a continuous supply of cooling water to the Paks Nuclear Power Plant even during record-low Danube water levels. Published with the professional recommendation of the National Water Directorate General, the article provides a detailed overview of this strategically important water management and engineering […]
Read moreDecisive Moments in Mohács: Creating a Dry Work Area in the Middle of a Rushing River
According to magyarepitok.hu, the construction of the Mohács Danube Bridge has reached a key phase: on October 1, the first shell element of Pier No. 3 was placed into the riverbed. During the works carried out by Duna Aszfalt Zrt., six reinforced concrete shell elements will be stacked to create a dry work area in […]
Read more