River Transport
We can move up to 2200 tonnes of cargo on the water with our four 80 m long TS barges in seven different pushing configurations. We carry out the implementation of the protection against wash-outs and, if necessary, the planning of the fairway diversions.
Featured References
River Wall Reconstruction, Csongrád
The town of Csongrád is situated on the right bank of the Tisza, on the outer curve of the river’s bend. Water depths of more than 10 metres can be measured here due to the work of the water, and even double that in case of floods.
Read more
Megyeri Bridge
We delivered the upper structure elements of the Megyeri Bridge at the Szentendre Danube branch in six pieces to the construction site.
Read more
Újpest Railway Bridge
The demolition of the “K” elements of the old railway bridge was carried out by having two floating cranes lift them together, and then we floated the new structural elements to the site.
Read morePress monitoring
Decisive Moments in Mohács: Creating a Dry Work Area in the Middle of a Rushing River
According to magyarepitok.hu, the construction of the Mohács Danube Bridge has reached a key phase: on October 1, the first shell element of Pier No. 3 was placed into the riverbed. During the works carried out by Duna Aszfalt Zrt., six reinforced concrete shell elements will be stacked to create a dry work area in […]
Read moreThe missing monument elements of the Chain Bridge are being lifted into place from a barge
Illustrated report on the restoration work carried out at Lánchíd.
Read moreThe giant floating crane plays a key role in the new milestone of the Paks Danube Bridge – video
The work process of raising the formwork trolley was captured on video at the Danube Bridge in Paks.
Read more