Shipping Business
Southern Railway Bridge– (2019-2022)
The original of the southern railway bridge over the Danube was opened to rail traffic on 23 October 1877. It has been rebuilt and modernised several times over the past century and a half. The latest modernisation was decided in 2015 and, after lengthy preparations, work started in 2019.
Read moreSalvage of Hableány River Cruiser, 2019.
It was the saddest and most harrowing task in our company’s history to salvage Hableány (Mermaid). The recovery of the ship was symbolic and attracted a lot of press attention.
Read moreÁtmentem (Crossed Over) Show, Budapest
„Átmentem” (Crossed Over) was a historic artistic production of the Budapest Grand Circus, at the opening ceremony of the 10th International Theatre Olympics and on World Circus Day, in connection with the 150th anniversary of the unification of Budapest.
Read moreRenovation of the piles of the Southern Railway Bridge 2011-2013
During the reinforcement of the river piers of the Southern Railway Danube Bridge and the addition of reinforced concrete panels to the piers, the construction schedule was repeatedly overruled by high water levels.
Read moreFINA World Aquatics Championships 2017
We were involved in the construction of two of the event’s most spectacular venues, the giant jumping tower and the water stage, and provided the on-water services for the event.
Read more20 August Fireworks
20 August is one of the oldest Hungarian holidays: the day of King St Stephen, the day commemorating the founding of the Hungarian state and the more than a thousand years of its existence, and the celebration of the new bread.
Read moreRiver Wall Reconstruction, Csongrád
The town of Csongrád is situated on the right bank of the Tisza, on the outer curve of the river’s bend. Water depths of more than 10 metres can be measured here due to the work of the water, and even double that in case of floods.
Read moreMegyeri Bridge
We delivered the upper structure elements of the Megyeri Bridge at the Szentendre Danube branch in six pieces to the construction site.
Read moreÚjpest Railway Bridge
The demolition of the “K” elements of the old railway bridge was carried out by having two floating cranes lift them together, and then we floated the new structural elements to the site.
Read moreRequest a quote
If you are interested in our services and equipment and would like to plan your future projects with us, please ask for a quote.